Neighborhood Enhancement Committee |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
EXTREME MAKEOVER! 2007 The Extreme Makeover! Committee is being co-chaired by: Dean Nyhart: pdnyhart@juno.com In April 2007 the Extreme Makeover! Committee was established to update the perimeter walls, signs and landscaping of our neighborhood. This effort, scheduled to be completed in August, will require financial commitments, in-kind contributions, and volunteer efforts from each of our homeowners. THE ISSUES:
THE DESIGN PLANS: (Neighborhood Enhancement Committee button) (Mary Anne will give me this content?) THE PROCESS: (Neighborhood Enhancement Committee button) (This is directly from the newsletter) Phase I – Design Under the leadership of Mary Anne Kuhn, we have hired Creative Environments to create the biddable design for walls, signs, and landscaping. Mary Anne is donating her time to work on the design for new signs. We’re thinking:
Phase II – Wall Construction Plan Dan Croyle and Steve Amelotte from the City of Tempe are working together with the neighbors who own property along Warner and McClintock to remove/replace damaged walls and take out the roots causing the cracks. They will also remove and rebuild signage walls to prepare for new signs. Creative Designs (or another licensed contractor) will then restucco the entire perimeter and signage walls with a smooth surface and paint with a color to be chosen by the committee with neighborhood input. Phase III – Sign Designand Construction Sign designs will be reviewed and chosen by the committee with neighborhood input. Construction will begin when design if finalized. We’re thinking:
Phase IV - Landscaping 65 plants were removed during the excavation and will be replaced by the City of Tempe. Additional plants will be added as funds are available in accordance with the design plans from Creative Environments and City of Tempe specifications. Tempe is also providing granite that will be spread across all landscaped areas. THE COST: (Neighborhood Enhancement Committee button)
We estimate the cost to be approximately $100,000 based on the work of other neighborhoods. A bank account has been opened at Bank of America and will remain open as long as the CDSENA, LLC exists. This will allow us to keep any additional funds raised to support future projects as they arise. MAKE CHECKS PAYABLE TO: Drop off or send to Mary Wolf-Francis 9320 S. Lakeshore Dr.
ACKNOWLEDGEMENTS: (Neighborhood Enhancement Committee button) Thanks to the following neighbors for their generous support of this project
Thanks to neighbor John Ellis for his very generous in-kind contribution of equipment, manpower and off-loading of dirt during the excavation phase of the project. The City of Tempe estimates this contribution to be worth over $30,000! Thanks to the following volunteers for their time in April shoveling, sweeping and digging during the excavation phase of the project: Dean Nyhart Pam Nyhart Mary Anne Kuhn John Ellis Russ Schoeneman Dianne Schoeneman Dave Merkel Patty Merkel Tom Ohe Dottie Ohe Kristen Ohe Brittany Ohe Linda Crook Gwen Cordiak Jim Cordiak Greg Kotsovolos Trish Gainer Dan Croyle Rick (Lovell?) Mary Wolf-Francis Jeff Francis Bill Francis Molly Francis Colleen Francis Dylan Crane John Spanias Steve Palbykir Paul Schmidt Dave Hoffman Patty Hoffman Bruce Hayes Jon Hightower Ziva Sachoff Rebecca Sachoff Peggi Paeper Louie Araneta Monica Araneta Bob Kawa Diane Kawa Connor McCormick Shaughn McCormick Andy Salome Suzie Spaulding Bill Hudzietz |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|